My Garage Build

My Garage Build

You can do this.

Menu

  • The Garage Build
    • Planning
    • Site Work
      • TreeWork
      • Concrete Foundation
    • Framing
    • Exterior Work
    • Heating
      • Radiant Floors
    • Interior Work
      • Flooring
    • Utilities
    • Windows and Doors
  • The House Build
    • Basement Re-Finish
    • Home Repair
  • The Camp Build
  • The Fleet
    • Rig Showcase
    • Fixing Vehicles
  • Tools
    • The Best Stuff For Your Garage
    • Show and Tell
  • News
    • Tips, Tricks and Wisdom
    • How to get stuff done

concrete

Foundation Day 2 – Mid Wall Footings

Day 2: Came back to strip the footing forms.  They built forms for the middle wall.  Then poured that same wall.  And they started to build the forms for the walls

adam June 10, 2011April 2, 2014 Building Stages, Concrete Foundation, The Garage Build No Comments Read more

Foundation Day 1 – Footings

Foundation Day 1 – Footings

Today my concrete guys started building the foundation.   They are doing the perimeter today and then pouring the middle wall probably tomorrow.  36 x 36 feet square.  Here are some sketchs I did in Google Sketch-up to illustrate what it

adam June 9, 2011April 2, 2014 Building Stages, Site Work, The Garage Build No Comments Read more

Concrete Foundation Decisions

The Foundation. This is the thing that holds the building up. It needs to not move preferably. Not in winter because of frost, or summer due to rain. We were going to pour it our selves. Ourselves meaning my buddy

adam June 8, 2011November 25, 2013 Concrete Foundation, Planning, Tips, Tricks and Wisdom 1 Comment Read more

Sand Thermal Mass Radiant Floor

Sand Thermal Mass Radiant Floor

Next step! Fill it in with sand.

adam September 20, 2009April 1, 2014 Basement Re-Finish, Radiant Floors No Comments Read more

New Sleepers for Sand Thermal Mass Radiant Floor

New Sleepers for Sand Thermal Mass Radiant Floor

So after nailing all those sleepers down, I found out almost instantly that they were not holding.

adam September 19, 2009April 1, 2014 Basement Re-Finish, Radiant Floors No Comments Read more

Install Styrofoam over concrete for radiant heated floors

Install Styrofoam over concrete for radiant heated floors

I decided that more than anything I wanted warm floors.  I wanted my heat to come from everywhere instead of one duct, or one radiator.  I have allergies to dust, so forced air was out of the question.  Running baseboards

adam September 10, 2009April 1, 2014 Basement Re-Finish, Radiant Floors No Comments Read more

Replace a Single Door with A Double French Door

Replace a Single Door with A Double French Door

Once there was a single door.  Then after lots of cutting and ripping and building there was a beautiful french door. 

adam August 29, 2009April 1, 2014 Basement Re-Finish No Comments Read more

Install plumbing into concrete slab for toilet, sink and shower

Install plumbing into concrete slab for toilet, sink and shower

In order to install a bathroom on a first floor or basement with a slab, one must cut into the concrete.   This was basically the very first project I did at the new house.   It was most definitely daunting to

adam August 5, 2009April 1, 2014 Basement Re-Finish No Comments Read more
Copyright © 2020 My Garage Build. Powered by WordPress. Theme: Spacious by ThemeGrill.