Day 2: Came back to strip the footing forms. They built forms for the middle wall. Then poured that same wall. And they started to build the forms for the walls
Foundation Day 1 – Footings
Today my concrete guys started building the foundation. They are doing the perimeter today and then pouring the middle wall probably tomorrow. 36 x 36 feet square. Here are some sketchs I did in Google Sketch-up to illustrate what it
Concrete Foundation Decisions
The Foundation. This is the thing that holds the building up. It needs to not move preferably. Not in winter because of frost, or summer due to rain. We were going to pour it our selves. Ourselves meaning my buddy
Dig the Foundation Hole
Step 1. Get Backhoe Step 2. Fill it up with Gas Step 3. Fill it full with hydraulic fluid Step 4. Try to get it to run right Step 5. Find cleared spot of land Step 6. Dig dirt with