11 thoughts on “Final Solder – Pellet Boiler Installation Plumbing Day 1 – 112 – My DIY Garage Build HD Time Lapse

  • January 28, 2013 at 7:46 pm
    Permalink

    Can’t wait to see that work !

    Reply
  • January 28, 2013 at 8:17 pm
    Permalink

    I so thoroughly enjoy watching your videos…all the videos! Thanks for
    uploading!

    Reply
  • January 28, 2013 at 9:35 pm
    Permalink

    Dude! Thanks! It’s really nice to know people enjoy them, cause I really
    enjoy making them. :)

    Reply
  • January 28, 2013 at 9:36 pm
    Permalink

    So CLOSE! Coming up soon! Thanks man!

    Reply
  • January 28, 2013 at 11:38 pm
    Permalink

    are you going to do time lapses again?

    Reply
  • January 28, 2013 at 11:40 pm
    Permalink

    Ah the question i’ve been asking myself. The kind of work i’m doing now,
    doesn’t timelapse well. I’m making very small changes to very small areas.
    (soldering, plumbing etc.) If I do larger work I will timelapse, but as the
    major build is done, I will probably do more videos. Are you missing the
    timelapse?

    Reply
  • January 28, 2013 at 11:55 pm
    Permalink

    you filling the system with water or coolant?

    Reply
  • January 29, 2013 at 5:11 am
    Permalink

    What’s next after you finish with the boiler?

    Reply
  • January 29, 2013 at 7:26 pm
    Permalink

    I was wondering, though, about the weatherconditions in your area; seeing
    al this sunshine and you walking around in a t-shirt! Heard you mentioning
    that this was in october; so pre-recorded!! Hopefully when the cold and the
    snow came you got the heatingsystem up and running! Speaking of
    “Downhill!?” Seeing the video on your other channel I imagine it’s downhill
    now on the snowscooter!!! Great video you uploaded there!!

    Reply
  • March 11, 2013 at 8:23 pm
    Permalink

    Would have loved to have seen the landscaping you did. Looks really cleared
    up in that very fast glimps. love the vids!

    Reply
  • March 18, 2013 at 4:40 pm
    Permalink

    I know. I regretted not taking video of the clean up process, but it was a
    bunch of tree felling and log cutting and brush burning, I felt like the
    first set of videos when I cleared the site was enough of that. Although
    you should have seen the stump pile! 20 huge stumps, loading it with an
    excavator, burned for 5 days! :)

    Reply

Leave a Reply